Bolted steel tanks, engineered to endure.
Factory-fabricated, site-erected modular tanks for water, fire, industrial and process storage — from cost-effective galvanised builds to food-grade stainless.
Premium materials, modern construction.
Constructed from galvanised, epoxy-coated, glass-fused or stainless steel panels with weather-resistant finishes, secure bolted joints and optional liners for potable-water compliance.
Four bolted tank technologies.
From cost-effective galvanised fire tanks to food-grade stainless — matched to your liquid, site and budget.
| Fusion Bonded Epoxy (FBE) | Galvanised Steel | Glass-Fused-to-Steel (GFS) | Stainless Steel (304 / 316) | |
|---|---|---|---|---|
| Material | Steel panels with fused epoxy coating | Steel sheet hot-dipped in molten zinc | Steel panels fused with glass both sides at 800°C+ | Chromium-nickel alloy — no coating or liner |
| Protection | Non-porous barrier coating, fused in-factory | Sacrificial zinc protection, often with internal liner | Inert, inseparable glass-to-steel barrier | Inherent corrosion resistance in the material itself |
| Key advantage | Handles liquids across pH 3–12; high-performance corrosion resistance | Proven, cost-effective fire & water tanks | Longest service life, handles harsh chemicals | Most hygienic; food-grade & high-purity liquids |
| Ideal for | Municipal & industrial, wastewater, chemical storage | Agriculture, fire-fighting, general industrial | Potable water, wastewater, industrial processing | Wineries, food & beverage, pharma, potable water |
| Relative cost | High | Medium | Premium | Very high |
| Maintenance | Very low | Medium | Very low | Very low |
Four stages. One crew.
We control every stage in-house — there is no subcontractor seam where quality or schedule can slip.
Design & Engineering
Capacity, site loads and code compliance worked out with our design partners before a single panel is cut.
Factory Fabrication
Panels rolled, coated and quality-checked in controlled factory conditions for repeatable precision.
Ring Beam Foundation
Reinforced ring-beam slab cast on site, surveyed level and cured to take the tank load.
On-Site Erection
Bolted assembly and commissioning by our own erection crews — fast turnaround, minimal site disruption.